Factory Preassembled Reel to Trench MMO Linear Anode Direct Burial System Reduced Field Labor Cost
Product Details:
| Place of Origin: | China |
| Brand Name: | High Broad or OEM |
| Certification: | ISO 9001, Full Batch QC |
| Model Number: | MMO-RT-009 |
|
Detail Information |
|||
| Anode Type: | Reel-to-Trench Preassembled MMO Linear | Reel Options: | Wooden (Export) / Steel (Returnable) |
|---|---|---|---|
| Standard Lengths: | 100m, 200m, 500m Per Reel | Labor Saving: | Up To 40% Vs On-Site Assembly |
| Contents: | Anode, Cable, Backfill, Jacket, Splices, Pull Rope | QC: | Factory Tested, Batch Traceability |
| Highlight: | Reel to Trench MMO Anode,Preassembled Direct Burial CP,Field Labor Saving Anode System |
||
Product Description
Reel-to-Trench MMO Linear Anode — Direct Burial System
Stop assembling anodes in the field. Our factory preassembled reel-to-trench system delivers complete, tested MMO linear anodes on deployment reels — pull, lay, connect, and bury. Field labor is reduced to three simple steps.
What's On the Reel
Every reel contains a complete, ready-to-install anode system:
- MMO/Ti anode wire — factory tensioned, no kinks
- Copper conductor cable — pre-connected at all splice points
- Coke breeze backfill — uniformly packed and contained
- Synthetic jacket — factory-sewn, seam integrity guaranteed
- All splice connections — epoxy sealed and Helium Leak Tested
- Pull rope and deployment instructions
Cost Comparison
| Item | On-Site Assembly | Reel-to-Trench |
|---|---|---|
| Labor (per 100m) | 16-24 man-hours | 4-6 man-hours |
| Splice Quality | Field-dependent | Factory guaranteed |
| Backfill Uniformity | Variable | Mechanically controlled |
| Weather Dependency | High | Minimal |
| QC Documentation | Limited | Full batch traceability |
Reel Specifications
Available in wooden (export) or steel (returnable) configurations. Standard lengths: 100m, 200m, 500m per reel. Custom lengths available.
Applications
- Large-scale pipeline CP projects
- Remote locations with limited skilled labor
- Fast-track construction schedules
- Projects requiring full QC documentation





